Beratzhausen - Laaber, Germany
Time frame: 09/2019 - 12/2019
Location: Beratzhausen, Line 5850 Regensburg - Nuremberg, Bavaria

Scope:
- 9.500m2 of storage area, of which 1.500m2 stabilized, prepared, maintained and restored
- Remove topsoil, supply and lay geomembrane and foil; subsequently remove and dispose of these
- Supply, install, remove and dispose of material
- Loosen soil, apply topsoil
- Construction of three passing places and an asphalt entrance
- Conventional reconstruction with 1,150 m of bedding, of which 700 m complete renewal and 450 m subgrade improvement
- Installation of 3,500 tonnes of track ballast and 1,700 tonnes of subgrade protection layer
- Provision of tracked excavators, wheel loaders, wheel excavators, tractors, high-speed dozers, rollers, as well as low loaders for moving the equipment within the construction site