Bebra, Germany
Time frame: 05/2017
Location: Rothenburg a. d. Fulda, Lispenhausen, Hesse
Scope:
- 650 m complete track renewal and subgrade improvement, with 20 cm trackbed protection layer and 30 cm ballast
- Excavation of a 200 m infiltration ditch for drainage
- Laying of geotextile
- Equipment included 2 tracked excavators, 1 wheel loader, 1 high-speed dozer, 1 roller, 1 sweeper and 4 tractors with dump trailers